FAANG prep — operating plan

A working document, not a brochure. Edit it as your situation changes — see how to edit at the bottom. Dates and progress below are computed live against today's date.

00Mission brief

Target level
Senior IC
Google L5 · Amazon SDE3 · MS 65/66
Role scope
ML/AI-titled
not generalist SDE — confirmed
Current comp
₹54L
45L fixed CTC + 20% variable
Post-hike comp
₹62.1L
15% base hike, Feb 2027
Target floor
₹81L+
30% above post-hike comp
Notice period
2–3 months
3mo standard, negotiable to 2

The one rule that shapes this whole calendar

No visible job-search activity before the promotion lands. Applications and recruiter screens are low-visibility and start 15 Jan 2027. Onsite loops naturally land in February anyway — after the announcement — so the constraint mostly resolves itself. See visibility rules.

01Target companies & comp

CompanyLevelIndia total compClears ₹81L floorConfidence
GoogleL5₹98L–1.52Cr (med. 1.19Cr)clearsCertain
AmazonSDE3 (L6)₹1.0Cr–1.81Cr (med. 1.37Cr)clearsCertain
Microsoft65/66~1.1Cr–2.08CrclearsLikely — 65 interpolated
AtlassianP50 (Senior)₹80.5L–1.26Cr (med. 1.03Cr)clearsLikely
StripeSenior+likely 1.2Cr+clearsLikely
NVIDIAIC4 (Senior)₹68.6L–1.23Cr (med. 87.9L)clearsCertain — thin cushion
DatabricksSenior~90L–1.2Cr (est.)clearsLikely
ConfluentSenior (L4/L5a)~95L–1.2Cr (est.)clearsLikely
SalesforceSenior/Lead MTS~90L–1.3Cr (est.)clearsLikely
Anthropic BengaluruSenior ICwide — ₹65L–2.2Cr rangelikely clearsLow — thin data, verify per req
Adobe IndiaSeniorno reliable data foundunknownLow — check directly
ServiceNowSenior (IC4/5)~70L–95L (est.)borderlineLikely — IC6/Staff clears, standard Senior may not
Walmart Global TechSenior SWE~51L anecdotalbelow floorLikely — needs P5/Staff

Watchlist, not committed: OpenAI India — confirmed scaling, engineering-specific roles not yet confirmed. Re-check each quarterly refresh.

02Visibility rules

Always safe, any time (Jun 2026 onward)

  • DSA, system design, mocks with paid platforms or peer-swap outside your company
  • Public writeups under your own technical brand — framed as career-building, not job-search
  • Resume/LinkedIn edits made privately, not published as "open to work"
  • Reconnecting with contacts — framed as catching up, no asks
  • Applications and recruiter screening calls — no leave required, not visible to your employer

Hold until mid-Jan 2027 (referral asks) / expect to land naturally near Feb (onsite loops)

  • Explicit referral asks — send these with applications from 15 Jan, not before. A referral after a cold application is weaker.
  • Informational interviews that explicitly discuss hiring at the target company — keep framed as career conversations through Dec 2026
  • Onsite/panel rounds — these need blocked time and naturally land 2–4 weeks after first contact, which puts them in Feb, right after your announcement

Never, until you've decided otherwise

  • LinkedIn "open to work" badge
  • Asking anyone inside your current circle for a referral or introduction at a target company
  • Authorizing a background check that would contact your current manager before you've resigned

03Risk & contingency

If your weekly hours drop below 10 in any week

Cut in this order: networking first (it's the most recoverable), then DSA depth (maintenance only), then system design (full mocks only, skip topic study). Never cut behavioral live rehearsal or, once active, applications/interviews — those have real deadlines attached.

Indian hiring seasonality — plan around it, don't fight it

  • Jan–Mar: strongest hiring window. You launch into the back half of this — good positioning.
  • Apr–Jun: stays elevated — post-bonus resignations force backfill hiring.
  • Mid-May–Jul: postings stay up but interview velocity slows — panel availability drops for vacations. Expect loops to stretch, not stall.
  • Aug and Dec: close to dead for lateral hiring. If anything slips into either month, expect a stop, not a delay.

Notice period math

3-month standard, negotiable to 2. If an offer lands in March–May 2027 and you negotiate the 2-month notice, your join date lands May–July 2027. Don't promise a start date to a recruiter before you've actually had the notice conversation with your manager.

Phase 1 — Foundation

invisible
Phase goal — true by 19 Sep 2026
~140 DSA problems banked with pattern fluency, not just completion. ML system design vocabulary solid enough to follow a case study without re-explaining basics. One public writeup live. Both resume variants drafted. Quiet reconnects underway, zero asks made.

Phase 2 — Depth

invisible
Phase goal — true by 19 Dec 2026
~230 cumulative DSA problems, hard patterns no longer novel. Eight full system design mocks completed, all grounded in your own production systems. STAR bank with 6–8 stories mapped to both Track A and Track B framing. Writeups #2 and #3 live. A real mock-derived sense of where you stand, not an assumed one.

Phase 3 — Pre-launch consolidation

invisible
Phase goal — true by 14 Jan 2027
Everything staged, nothing fired. Target list final. Materials tailored per company. Referral-ask messages drafted and queued. Resume reflects all three writeups as evidence, not claims. Ready to move the instant it's time.

Phase 4 — Active search & close

visible from 15 Jan
Phase goal
Applications and referral asks fire 15 Jan. Track B offers expected late Feb–Mar, Track A offers Mar–May. Decision made on real comp data, not guesses. Resignation and notice timed around the hike landing. Join Jun–Jul 2027.